DUNOLLY- THOMPSON STREET TEMPORARY CLOSURE

January 19, 2018

TEMPORARY CLOSURE

TEMPORARY ROAD CLOSURE: THOMPSON STREET, DUNOLLY

As part of the Murray Basin Rail Project, McConnell Dowell Martinus Rail Joint Venture (MMJV) is working around level crossings on the Mildura rail line.

LOCATION: Thompson Street Dunolly

DAYS: Thursday 25 and Friday 26 January 2018

TIMES: Closure 6.30am to 6pm each day

Temporary closures on this level crossing will occur and traffic management controls will be in place due to these changed conditions, with detours and/or intermittent access.

Please drive at a reduced speed approaching any work activity and adhere to detours or comply with barriers or signs indicating any traffic delays.

For information about this V/Line project call 1800 800 007

For local works information contact the MMJV hotline: 0439 101 685

Your safety is our ‘number one’ priority, and we appreciate your cooperation during this time.

TEMPORARY ROAD CLOSURE: THOMPSON STREET, DUNOLLY

As part of the Murray Basin Rail Project, McConnell Dowell Martinus Rail Joint Venture (MMJV) is working around level crossings on the Mildura rail line.

LOCATION: Thompson Street Dunolly

DAYS: Thursday 25 and Friday 26 January 2018

TIMES: Closure 6.30am to 6pm each day

Temporary closures on this level crossing will occur and traffic management controls will be in place due to these changed conditions, with detours and/or intermittent access.

Please drive at a reduced speed approaching any work activity and adhere to detours or comply with barriers or signs indicating any traffic delays.

For information about this V/Line project call 1800 800 007

For local works information contact the MMJV hotline: 0439 101 685

Your safety is our ‘number one’ priority, and we appreciate your cooperation during this time.

< Back to News Archive